Vendor Quote Comparer
Compare 2–5 contractor bids side by side: price, scope, timeline, warranty and gaps, plus a recommendation and questions to ask each vendor.
New Added
Use it when
You have several quotes for a roof, HVAC replacement, turnover or rehab and need an apples-to-apples view before approving or sending to an owner.
Not for
Verifying licenses or insurance. Check those directly with your state licensing board and the vendor's certificate of insurance.
The prompt
Fill in the variables (optional)
Type below and the prompt updates. Anything you leave blank stays as a {{variable}} for you to fill in later. Nothing you type leaves your browser.
What the work is
What matters most
Budget or NTE
Paste each quote's text, labeled by vendor
Compare these contractor quotes for: {{job}}. My priorities, in order: {{priorities}} Budget or not-to-exceed: {{budget}} QUOTES {{quotes}} Output: 1. A comparison table: Vendor | Total price | What's included | What's excluded/unclear | Timeline/start date | Warranty | Payment terms | Red flags 2. SCOPE GAPS: items one vendor included that others did not, so I can normalize the bids. 3. RECOMMENDATION: which vendor fits my priorities and why, in 3–4 sentences. If the quotes are not comparable, say what must be clarified first. 4. QUESTIONS TO ASK each vendor (2–3 each). 5. A short owner-ready summary (under 100 words). Use only information in the quotes. If something is missing, write "not stated".
Variables
| Variable | What to enter | Example |
|---|---|---|
{{job}} | What the work is | replace 3-ton AC condenser and evaporator coil at a single-family rental |
{{priorities}} | What matters most | reliability, warranty length, price, speed |
{{budget}} | Budget or NTE | $7,500 |
{{quotes}} | Paste each quote's text, labeled by vendor | Vendor A: $6,900, 14 SEER2, 10-yr parts/1-yr labor, start Monday... Vendor B: ... |
Example output
Illustrative output using the example values. Your results will vary by AI tool and inputs. All names and details are fictional.
| Vendor | Total | Included | Excluded/unclear | Timeline | Warranty | Terms | Red flags | |---|---|---|---|---|---|---|---| | A | $6,900 | Condenser + coil, line set flush, permit | Thermostat not stated | Starts Mon, 1 day | 10-yr parts / 1-yr labor | 50% deposit | Deposit is high | | B | $7,350 | Condenser + coil, new line set, permit, thermostat | none | Starts in 2 weeks | 10-yr parts / 5-yr labor | Due on completion | none | | C | $5,800 | Condenser only | Coil, permit not stated | Starts Wed | 5-yr parts | 30% deposit | Mismatched system risk | SCOPE GAPS: Only B includes a new line set and thermostat; C omits the coil and permit. RECOMMENDATION: Vendor B best matches reliability and warranty priorities and is within budget...
Tips
- Paste quotes as text (copy from PDF) or upload the PDFs in a model that supports files.
- Always confirm license, insurance, and lien waivers before paying.
Works in
Don't paste anything you're not allowed to share (SSNs, bank details, private tenant records) into an AI tool. Check your company's AI policy.
Related prompts
Vendor Dispatch Message
New AddedWrite a clear work order for a vendor: issue, access instructions, tenant contact rules, photos, not-to-exceed amount and completion requirements.
Maintenance Request Triage
New AddedTriage a tenant maintenance request (text or photo): likely issue, urgency, trade needed, safe troubleshooting steps and a reply to the tenant.
Make-Ready / Turnover Scope Builder
New AddedTurn move-out notes and photos into a room-by-room turnover scope with tasks, trades, priority and a rough order of operations.